great results
St. Mary's Cement Facility
Ontario, Canada
Heavy Lift / Erection Engineering
Ruby+Associates designed the temporary support structure, temporary foundations and lateral transport system necessary to lift the 452 ton, 158-foot long rotary kiln section 70 feet in the air, move it 33 feet, and precisely lower it 40 feet onto its permanent supports.