great results
MET-2 Miami Office Tower
Miami, Florida
Connection Design & Heavy Lift / Erection Engineering
Working with Southern Steel and Peterson Beckner, Ruby+Associates provided connection design and erection assistance for this 47-story, 6000-ton office tower. A two story deep, 107-foot span transfer truss over a ballroom required massive bolted connections and a shoring and temporary bracing plan.