New Motor City Gateway,
Interstate 94 Arched Bridge
Wayne County, Michigan
Heavy Lift / Erection Engineering
Ruby+Associates performed construction
engineering for these twin tied-arch bridges-each supporting a 240-ft-long
deck span designed to carry four lanes of traffic. The design and erection
had to minimize disruptions to traffic and meet a deadline that could
not be extended. Ruby proposed an alternate construction method that eliminated
the need for massive and expensive shoring.
