great results
New Motor City Gateway, Interstate 94 Arched Bridge
Wayne County, Michigan
Heavy Lift / Erection Engineering
Ruby+Associates performed construction engineering for these twin tied-arch bridges-each supporting a 240-ft-long deck span designed to carry four lanes of traffic. The design and erection had to minimize disruptions to traffic and meet a deadline that could not be extended. Ruby proposed an alternate construction method that eliminated the need for massive and expensive shoring.