great results
Main People Mover Station, Washington Dulles International Airport
Dulles, Virginia
Connection Design
Metropolitan Washington Airports Authority is designing and constructing two new automated people mover stations, at a projected construction cost of nearly $1 billion, to accommodate continually increasing passenger growth and replace the original system. Ruby+Associates has been providing connection design and structural engineering consulting for the past 5 years. Currently, Ruby is assisting with the station’s cable elements, which are being imported from China.