Metropolitan Washington Airports
Authority is designing and constructing two new automated people mover
stations, at a projected construction cost of nearly $1 billion, to accommodate
continually increasing passenger growth and replace the original system.
Ruby+Associates has been providing connection design and structural engineering
consulting for the past 5 years. Currently, Ruby is assisting with the
station’s cable elements, which are being imported from China.
