C5 Hangar Installations,
Memphis International Airport
Memphis, Tennessee
Heavy Lift / Erection Engineering
The Tennessee Air National Guard
was constructing two side-by-side hangars simultaneously. Working with
the erector, Ruby+Associates eliminated the need for shoring using a two-crane
tandem lift system and minimized temporary bracing requirements by designing
one set of reusable stability struts for both facilities. Ruby+Associates
also assisted the construction manager during pre-construction.
