The Florida Marlin's new 38,000-seat, 967,000-square-foot stadium includes a retractable roof with three independent truss panels traveling on a 130-foot tall concrete track beam system. Working with Hunt/Moss, a joint venture, Ruby provided a constructability review for the 130-foot lift of eight 1000 to 1,700-ton concrete track beams, and the installation of 10,000 tons of structural steel that support the three moveable roof panels, by developing strategies for lift and safety procedures while maintaining schedule.
