North Clinton Windpark

Clinton, New York
Lift Engineering


Noble Environmental Power is constructing a 67 turbine, 100.5 megawatt windpark, which will create enough energy to power about 33,500 homes. Ruby+Associates assisted in designing the lift for the 65-ton mast sections, which reach over 260 feet high at completion and support three blades measuring more than 130 feet in length.